The All-in-one Solution for Construction Projects

CUBE brings together planning, tracking, collaboration and more into a single, intuitive platform, and CUBE AI turns that single source of truth into answers, actions and early warnings.

Free 14 day trial · No credit card required
How many M30 columns on Level 12?
Which reviews are overdue this week?
What slips if the L12 pour moves a week?
Show open clashes in Tower A MEP.
Draft the monthly owner update.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Progress vs Baseline
Actual
65%
Planned
72%
Progress versus baseline S-curve: actual progress 65 percent against a planned 72 percent in July
Overall Progress
A002 Site Plan – R3
Site plan sheet A002 with a revision cloud markup
app.cube.ms — Harbor Point Tower
Progress
64.8%
Open Issues
23
Reviews Due
6
Federated 3D model of the CUBE office building with a clash highlighted
3D — CUBE Office · Federated v14
Clash C-118
L12 GA drawing set r3 — review
Overdue
CUBE AI
What slips if the L12 pour moves a week?
3 successor tasks slip 5 days. Façade start moves to 18 Nov, still inside the milestone.
View Impact
Update Schedule
Draft the owner update.
Drafted with 2 attachments from Files. Routed to you for sign-off.
Which reviews are overdue on L12?
4 reviews are overdue. The L12 GA set r3 is 6 days late with the structural consultant.
Open Reviews
Send Reminders
Escalate the GA set.
Escalation sent to the structural lead and logged against the review.
Summarize open site issues this week.
23 open issues, 7 raised this week. 3 are safety items on Level 9, due tomorrow.
View Issues
Assign Owners
Assign the safety items to the site safety lead.
Assigned 3 issues with a due date of tomorrow, 5 pm. Recorded in the activity log.
Customers

Trusted by the teams building public and private infrastructure

$100B+
Project value managed
70,000+
Users on the platform
1,000+
Projects on the platform
150+
Organizations
Fitchner
Tech Mahindra
CPWD
Ifcon
MPM
Nhai
Airports authority of India
Key Stone
KMV
Maharastra Jeevan Pradhikaran
RKSCPL
NKG
GS express
HG Infra
Ceinsys
Security & Compliance

Independently audited, enterprise-grade by default

CUBE is certified for information security, quality and BIM information management, so project data meets the standards public-sector owners set.

Products to Streamline Your
Construction Workflows

Use CUBE ..

ALL PRODUCTS
->
.. as a

Common Data Environment

A common data environment (CDE) provides a single source of truth for project information and documentation. Streamline workflows with configurable forms and role-based access.


.. for

Project Management

Our project management solution transforms disjointed tasks and siloed data into dynamic project dashboards. Build comprehensive plans, assign tasks, track progress, and identify real-time risks.


.. to create

Digital Twins

Digital
Twins

Digital twins mirror the physical construction site through 3D models, IoT sensors, and more. Visually track progress versus schedule, spot issues early, and course-correct in real-time.

Platform Architecture

One Platform, Built in Layers

Three products for every stage of the asset lifecycle, one AI layer running through all of them, and the same services and portal underneath. Select any layer to see what it holds, or point at a module block to name it.

PortalUnlimitedProjects · Storage · HistoryAdd-onsPlatform ServicesChatConnectionsFormatsAdminCUBE AIMCP ServerDigital TwinsProject ManagementCommon Data EnvironmentProducts
Design & Coordination · Use CUBE as a

Common Data Environment

Per user seat

Information management and approvals: one governed source of truth for every stakeholder.

Construction Delivery · Use CUBE for

Project Management

Per user seat

Planning and delivery: cost, time, site and contracts on the same record the CDE holds.

Operations & Maintenance · Use CUBE to create

Digital Twins

Per user seat

Operations and maintenance: the as-built record carried into the life of the asset.

AI Layer · One seat, embedded in every product

CUBE AI

Per user seat

One independent seat inside all three products: ask across project data, draft transmittals, triage issues, flag schedule and cost risk, create records with approval.

What it does
Ask across project data
Draft transmittals
Triage issues
Flag schedule and cost risk
Create records with approval
MCP Server
Use CUBE inside Claude
ChatGPT
Other AI assistants
Platform Services · Shared by every product and seat

Platform Services

Included

The services every product and every seat share, so teams work the same way wherever they are in CUBE.

Chat · Project, group and direct
Project chats
Group chats
Direct messages
Every product, web and mobile
Connections · Schedules in, data out via open API
Microsoft Project
Primavera P6
Power BI
BI tools
SAP
Oracle
Formats · 60+ viewed in the browser
Administration · Configure once, govern everywhere
Portal settings
Project settings
User settings
Role and permission based
Portal · Foundation and add-ons

Your CUBE Portal

Every portal

The foundation everything runs on, with add-ons billed per portal and available across all products.

Included in every portal
Unlimited projects
Unlimited Spaces
Unlimited storage
Unlimited version history
Business-hours support
Add-ons · Billed per portal, across all products
BIM Server
Clash Detection
White Labeling
Custom Modules
Productivity
₹153
Lakh Cr
lost due to poor data management in the construction industry
Risk
25%
of megaprojects suffer cost overruns of more than 30 percent
Time
77%
of mega projects are at least 40 percent late
Agentic AI, Built Into CUBE

Use CUBE AI across the whole Project Portfolio

CUBE AI works on the same single source of truth as your team: it answers from your project data, does the work you delegate and flags risks early, always under your permissions and with your approval.

CUBE AI
↻ Replay
Which reviews are overdue across my projects?
Checked Reviews, Inspections and Progress Updates
✓
6 reviews are overdue across 3 projects — both Harbor Point overdues sit on the L12 structural package.
Reviews 6 · 2 overdue
Inspections 5
Progress updates 3
Ask about your project…
CUBE AI
↻ Replay
Raise an issue for the L12 rebar mismatch and assign QA.
Prepared the issue in Structures for your approval
✓
Create Issue #482 · Structures · Assign QA Team · Due Friday
Approve
✓ Approved
Edit
Issue #482 created and assigned to QA. Recorded in the activity log.
Ask about your project…
CUBE AI
↻ Replay
What slips if the L12 pour moves a week?
Checked Schedules and dependent tasks
✓
3 successor tasks slip 5 days. Crane demob holds. Here is the impact across the package:
+5 days
MEP rough-in and 2 successor tasks
Oct 14
Façade start, moved from Oct 9
On track
Structure top-out milestone holds
Ask about your project…
Built-In Guardrails

Your Approval, Every Time

CUBE AI proposes; you confirm. It never creates, sends or changes anything without your manual approval.

Every Action on the Record

Each action CUBE AI performs is logged as its own entry in the activity log: what was done, when, and for whom.

Sees Only What You Can See

CUBE AI follows your role-based permissions. If you can't view or edit something, CUBE AI won't show it or act on it.

Integrated Modules for
the Entire Project Lifecycle

VIEW ALL
Folders

Folders

Secure virtual folders for project files and data.

Clash Tests

Clash Tests

Detect and resolve design conflicts pre-construction.

Files

Files

Maintain centralized document control.

Inspections

Inspections

Complete punch lists and manage site observations.

Issues

Issues

Log, assign, and track issues to resolution.

Reviews

Reviews

Coordinate digital drawing reviews and redlining.

Mailbox

Mailbox

Centralize all project communication in one place.

Tasks

Tasks

Create, assign, and monitor tasks for efficient project coordination.

Schedules

Schedules

Plan and track project timelines.

Transmittals

Transmittals

Share files between spaces while maintaining a complete audit trail.

Estimates

Estimates

Develop accurate cost plans tied directly to project scope.

Progress Updates

Progress Updates

Track task and milestone status in real-time.

Contracts

Contracts

Manage contracts, budgets, and milestones seamlessly.

3D BIM · CAD · PDF

The Whole Design — Viewable, Reviewable, Askable

Every model, drawing and document opens in the browser — and CUBE AI reads the geometry too: counts, quantities, clashes and review status in plain English.

—
Federate and walk 3D BIM models — no desktop software
—
Compare CAD revisions, measure and redline in place
—
Stamp and approve PDFs through ISO 19650 review workflows
—
Clash pins become Issues — assigned, tracked, resolved
Federated 3D model of the CUBE Clinic: facade, entrance canopy, car park and landscaping
CUBE Clinic — Federated v14
Clash C-118 · Duct vs Beam
COL-G-004
Material
Concrete M30
Section
450 × 450
Level
Ground Floor
Volume
1.6 m³
“How many M30 columns on the ground floor?”
24 columns · 39 m³
CAD site plan of the CUBE office: building footprint, parking and landscaping
1
A002 Site Plan — r3
Compare r3 → r2 · 14 changes
Measure
Redline
Layers
“What changed between r2 and r3?”
14 clouded revisions — 9 in the east parking bays
PDF sheet A002, Site Plan at 1:200, with title block
2
Approved
ISO 19650 · S4 → A1
A002_Site_Plan.pdf · Sheet 2 of 12
“Summarize the open comments on this sheet.”
2 open — both on the parking layout

Features That Redefine the
Way Projects Are Managed

ALL FEATURES

Control Project Time & Cost

Get live access to 4D schedule and 5D cost data for real-time insights.

Type image caption here (optional)

Configurable Series & Parallel Reviews

Review documents and contracts with the ability to add digital signatures and Aadhaar based verification of drawings and BIM Models.

Collaborative Forms

A single source of truth for all project information, be it design, documentation, estimates, timelines or contracts.

Type image caption here (optional)

Universal File Support

Upload, view and collaborate on various Industry standard formats and Documents.

‍

Robust 5D Streaming

Work on complex 3D BIM and CAD files with full navigation and markup tools and the ability to integrate with time and cost.

‍

ISO 19650 & OpenBIM compliant

One of the first ISO 19650 certified platform that also advocates OpenBIM and Data exchange principles.

‍
Pause
Play
Industries

One Platform for Every Kind of Capital Project

Owners, consultants and contractors run CUBE across the whole built environment, with the same products, modules and CUBE AI in each sector. What changes is the workflow configuration, not the platform.

Offices · Retail · Mixed-Use
01 / 09

Commercial

Office, retail and mixed-use developments: design coordination, approvals and handover documentation on one project record from concept to fit-out.

Apartments · Townships · Villas
02 / 09

Residential

Townships, high-rise and villa projects: unit-level progress, snagging and customer handover handled on the same platform the site team already uses.

Arterials · Junctions · Transit
03 / 09

Roads

Urban road and junction programs: survey data, drawings and inspections tied to chainage, with every contractor and consultant reporting into one view.

Expressways · Interchanges
04 / 09

Highways

Expressways and interchanges across multiple packages: structures, earthworks and tolling infrastructure tracked against baseline, kilometer by kilometer.

Viaducts · Stations · Depots
05 / 09

Metros

Viaducts, stations and depots: ISO 19650 document control and clash management across the civil, systems and rolling-stock interfaces.

Plants · Refineries · Warehousing
06 / 09

Industrial

Plants, refineries and warehousing: EPC packages, vendor drawings and shutdown windows managed to the equipment tag, not the email thread.

Hyperscale · Colocation · MEP
07 / 09

Data Centers

Hyperscale and colocation builds where commissioning is the project: checklists, issues and as-built models that become the operating digital twin.

Solar · Wind · Grid · Water
08 / 09

Energy & Utilities

Solar, wind, grid and water assets on dispersed sites: inspections and progress captured on mobile and rolled up for the owner each morning.

Hospitals · Campuses · Civic
09 / 09

Healthcare & Education

Hospitals, campuses and civic buildings with long approval chains: audit-ready document control and reporting that every stakeholder can read.

In Their Words

What Our Customers Say

Reviews that used to travel by email and courier now close inside CUBE with a full audit trail. Our approval cycle on design packages came down from three weeks to under one, and nobody argues about which version is current anymore.

Director of Design Management
Transit Authority

We run eleven jobsites on CUBE and I see every inspection, every open issue and every pay application from one screen. The AI assistant answers the questions I used to spend Monday mornings chasing people for.

VP of Construction
Heavy Civil General Contractor

Our clients get their as-built record and asset registers in CUBE at closeout, not a room full of boxes. It has become part of how we win work, because we can show the digital twin before the building is finished.

Director of VDC
Multidisciplinary Engineering Firm

Change orders used to sit in inboxes for weeks. On CUBE every one is tied to the RFI, the drawing and the schedule activity behind it, so the owner approves faster and we stopped eating cost we could not document.

Project Executive
Commercial General Contractor

I have six capital projects running and I cannot be on all of them. The weekly roll-up CUBE AI gives me is the first report I have trusted without calling the superintendent to check it.

Director of Capital Projects
Healthcare System

The schedule lives in Primavera, the models live in Revit, and CUBE sits in the middle so the field never works from a stale set. Rework on our last two jobs was the lowest we have ever recorded.

Director of Project Controls
Design-Build Firm

We onboarded forty trade partners in a month. Their crews use the mobile app for inspections and punch lists without a training session, and our office finally stopped keying field data into spreadsheets.

Program Manager
Owner's Representative Firm

Every submittal, transmittal and record drawing for a four-hundred-million-dollar program sits in one governed place, with review workflows the auditors could follow without us in the room.

Director of Document Control
Program Management Firm

CUBE's team configured our forms and registers to match the way we already deliver, then trained our internal champions. Six weeks from signature to a live program, and support still picks up the phone.

Chief Operating Officer
Data Center Developer

Success Stories from the
CUBE Community

Boosting Efficiency Across Metro Rail Projects

$4B Project Value

CUBE customized a platform for a state Metro Rail Corporation to manage the design, construction, and operations, with ERP Integration across two cities. The solution encompassed Document Management, Design Coordination, CAD/BIM viewing, Estimation, Billing and more, backed by a dedicated team serving over 300 users throughout the process.

Boosting Efficiency Across Metro Rail Projects

CDE Implementation for a Real Estate Developer in India

50+ Users | 15 Projects managed | 100% Cloud-based operations

CUBE implemented a centralized Common Data Environment for a leading real estate developer in India to streamline project coordination, document management, and stakeholder communication across multiple projects. The platform replaced fragmented local systems with standardized nomenclature, ISO-aligned file structures, and structured review workflows, improving traceability and governance. By enabling controlled access, real-time collaboration, and centralized project data, CUBE helped project teams, consultants, and contractors maintain clear visibility into project progress, reduce manual follow-ups, and strengthen coordination throughout the project lifecycle.

CDE Implementation for a  Real Estate Developer in India

Common Data Environment Implementation for a Global Design Consultant

250+ Users | 30+ Projects

A global design consultant needed a unified way to streamline reporting, documentation, and multi-team reviews. CUBE delivered a centralized Common Data Environment that automated reporting, simplified Transmittals, integrated review workflows, and connected previously siloed tools into a single platform. The customized solution improved collaboration, reduced errors, accelerated approvals, and supported users with consistent, real-time project visibility.

Common Data Environment Implementation for a Global Design Consultant

Custom Solution for Secure Public Sector Workflows

7500+ Projects | 285+ Training Sessions

A major government agency needed to digitize their construction review and collaboration processes while storing data securely on in-country servers. With CUBE, we delivered a tailored solution with robust CAD/BIM viewers, document management, issue tracking, configurable workflows, and DQ-DQ integration. The customized platform met their unique public sector requirements where other tools fell short

Custom Solution for Secure Public Sector Workflows

Digitizing Workflows for a G+43 Mixed-use Development

100+ users

CUBE delivered a cloud-based solution for a G+43 mixed-use urban development to streamline model coordination, documentation, and stakeholder communication. The platform unified BIM workflows, version control, clash detection, issue tracking, and 4D simulations into a single system, replacing fragmented tools and reducing delays caused by disconnected processes. Integrated model federation, structured approvals, 5D insights, and centralized storage enabled the client’s design, construction, and O&M teams to collaborate efficiently, resolve issues faster, and maintain visibility across the project lifecycle.

Digitizing Workflows for a G+43 Mixed-use Development

Driving Construction Excellence for Real Estate Ventures

CUBE designed a bespoke platform for a distinguished real estate firm managing over 35 million square feet of high-rise developments. The solution combined document management, CAD/BIM visualization, estimation, and progress reporting, enabling effortless rate extraction from SAP, comprehensive quantity listing and site management to streamline workflows across the expansive portfolio.

Driving Construction Excellence for Real Estate Ventures

Modernizing Project Coordination for a National Highway Initiative

$250 Mn Project Value

CUBE deployed a cloud-based project management platform for a national infrastructure agency delivering a 15.1 km highway corridor in North India. The solution replaced fragmented tools with a unified system supporting BIM visualization, document reviews, digital approvals, clash detection, scheduling, and 5D dashboards. Purpose-built for large-scale infrastructure programs, the platform enabled seamless coordination among stakeholders and government authorities, improving decision-making and providing real-time visibility into costs, progress, and compliance.

Modernizing Project Coordination for a National Highway Initiative

Revitalizing a Railway Station and Reimagining Project Management

$43m Project Value

CUBE successfully launched an advanced Project Management Information System (PMIS) for the redevelopment of a Railway Station in India. This innovation featured Document Management, CAD/BIM viewing, Issue Management, and Progress Reporting. Moreover, the MIS team was equipped with personalized training sessions to augment workflows during implementation.

Revitalizing a Railway Station and Reimagining Project Management

Sophisticated Document Management for Airport Infrastructure

CUBE delivered a robust digital platform for the construction of an Airport's new ATC Tower and Technical Block. Its sophisticated Document Management System honed Design Coordination, Issue Tracking, CAD/BIM Viewing, and custom workflows. The adaptive version management and distinctly stratified forms and approvals guaranteed meticulous project oversight.

Sophisticated Document Management for Airport Infrastructure
Digital Transformation

Get more than just software. CUBE is your partner for Digital Transformation.

Buying a platform is the easy part. CUBE's own team takes you from a signed contract to a live, adopted system in five steps, and stays with you after go-live. Step through what each one delivers.

1
Implementation
Our team structures your projects, spaces and workflows on CUBE, mapped to how your organization actually delivers.
  • Project and portfolio structure
  • Spaces and folder architecture
  • Workflow mapping with your PMO
2
Configuration
Forms, registers, review flows and permissions tuned to your standards, including how CUBE AI works within them.
  • Configurable forms and registers
  • ISO 19650 review workflows
  • Roles, permissions and AI guardrails
3
Hosting
Cloud or dedicated environments with enterprise-grade security, run and monitored by CUBE.
  • SOC 2 Type II and ISO 27001
  • Shared cloud or dedicated instance
  • Backups, uptime and monitoring
4
Training
Role-based onboarding through CUBE Academy so every stakeholder is productive from the first week.
  • CUBE Academy courses and certifications
  • Role-based onboarding sessions
  • Admin and champion enablement
5
Support
A named success team, in-app help and a support line that answers, for the life of the subscription.
  • Dedicated customer success manager
  • In-app help and ticketing
  • Quarterly health reviews
Talk to Our Team
Open Platform

Bring Your Own Agent

The CUBE MCP server exposes the same tools that power CUBE AI to Claude, ChatGPT, Gemini, Copilot and any MCP-compatible agent your teams already use. Your project data becomes a first-class workspace for AI, on your terms.

—
Same capabilities as CUBE AI in-product — ask, act, anticipate
—
Agents run under the signed-in user's role-based permissions
—
Every agent action recorded in the activity log, like any user's
—
Agents ask for your approval before any change
—
Admins choose which outside AI tools can connect
Read the MCP Docs
Claude
CUBE MCP connected
↻ Replay
Connected to CUBE · 3 projects in scope · role: Project Engineer
What needs action before Friday?
Used CUBE · projects.getActionableCount()
6 reviews (2 overdue) · 5 inspections · 3 progress updates
Create the QA issue for the L12 rebar mismatch
Used CUBE · issues.createIssue({ space: "Structures", assignedTo: "QA" })
CUBE approval
Requested in CUBE · Approved by you
✓ Issue #482 created · recorded in the activity log
Reply to Claude…
ChatGPT
CUBE MCP connected
↻ Replay
Connected to CUBE · 3 projects in scope · role: Project Engineer
How many M30 columns on Level 12?
Used CUBE · queries.queryModelProperties()
46 columns · 128 m³ · 14 section sizes — Tower A Structural v14
Send the L12 pack to the owner as a transmittal
Used CUBE · transmittals.create({ to: "Owner", files: 12 })
CUBE approval
Requested in CUBE · Approved by you
✓ Transmittal TR-0142 sent to Owner · recorded in the activity log
Message ChatGPT
Gemini
CUBE MCP connected
↻ Replay
Connected to CUBE · 3 projects in scope · role: Project Engineer
Which reviews are overdue on CUBE Clinic?
Used CUBE · reviews.list({ status: "overdue" })
4 overdue · oldest is the A002 site plan r3, 6 days with the structural consultant
Remind the reviewers and copy the project manager
Used CUBE · notifications.send({ to: "reviewers", cc: "PM" })
CUBE approval
Requested in CUBE · Approved by you
✓ Reminders sent to 3 reviewers · PM copied · recorded in the activity log
Ask Gemini
Microsoft Copilot
CUBE MCP connected
↻ Replay
Connected to CUBE · 3 projects in scope · role: Project Engineer
Summarize this week's site inspections
Used CUBE · inspections.summary({ week: "current" })
18 inspections · 15 passed · 3 failed items, all safety, on Level 9
Raise issues for the failed items and assign the safety lead
Used CUBE · issues.createBatch({ from: "inspections", assignee: "Site Safety" })
CUBE approval
Requested in CUBE · Approved by you
✓ 3 issues raised · due tomorrow 5 pm · recorded in the activity log
Message Copilot
Cursor
CUBE MCP connected
↻ Replay
Connected to CUBE · 3 projects in scope · role: Project Engineer
Export this month's progress updates as JSON for our dashboard
Used CUBE · progress.export({ format: "json" })
312 updates · 4 projects · schema v2 · 1.8 MB
Schedule this export weekly into the BI bucket
Used CUBE · automations.create({ every: "Mon 06:00", target: "bi-bucket" })
CUBE approval
Requested in CUBE · Approved by you
✓ Weekly export scheduled · first run Monday 06:00 · recorded in the activity log
Ask Cursor

Integrations to Enhance Your Tech Stack

CUBE works alongside the software you already run. Scheduling, design authoring, ERP, document and reporting platforms sync into the same single source of truth, so nobody re-keys data between systems.

All Integrations
Oracle Primavera
Oracle Primavera
Dropbox
Dropbox
MS Project
MS Project
Google Drive
Google Drive
Autodesk Revit
Autodesk Revit
SAP
SAP
IBM Maximo
IBM Maximo
Microsoft 365
Microsoft 365
Power BI
Power BI

Read the Latest CUBE Insights

VIEW ALL