Technology
5 min read

Digitizing Workflows for a G+43 Mixed-use Development

CUBE delivered a cloud-based solution for a G+43 mixed-use urban development to streamline model coordination, documentation, and stakeholder communication. The platform unified BIM workflows, version control, clash detection, issue tracking, and 4D simulations into a single system, replacing fragmented tools and reducing delays caused by disconnected processes. Integrated model federation, structured approvals, 5D insights, and centralized storage enabled the client’s design, construction, and O&M teams to collaborate efficiently, resolve issues faster, and maintain visibility across the project lifecycle.

Client Name

Ali & Sons Holding LLC

Published on

Sep 2025

Download Now

Problem Statement

The CP-02 G+43 Mixed-Use Development project required a centralized system to manage BIM workflows, version control, and stakeholder coordination. Access to large BIM files was inefficient, and correspondences were fragmented across platforms, leading to delays and miscommunication.Despite having BIM models, the team relied on CAD-based estimation tools, which limited productivity.

The use of multiple disconnected software solutions increased costs and complexity. A unified platform was needed to streamline document control, enable cost-effective BIM workflows, and improve cross-functional collaboration.

Solution

A cloud-based BIM Management platform was deployed to streamline workflows, enable centralized coordination, and ensure smooth project operations while adhering to timelines, budgets, and stakeholder collaboration requirements.

  • Secure Cloud Hosting – Provided a single source of truth with compliance-ready storage.
  • Document Management – Organized spaces aligned with standards for efficient retrieval.
  • Issue Management – Quick resolution and transparent collaboration across teams.
  • Clash Detection & Coordination – Multi-disciplinary clash tests on federated models.
  • 4D Simulation – Linked schedules to model elements for progress monitoring.
  • 5D BIM Integration – Combined model data with cost estimation for optimized resource allocation.

Table of Contents

Introduction

Mi tincidunt elit, id quisque ligula ac diam, amet. Vel etiam suspendisse morbi eleifend faucibus eget vestibulum felis. Dictum quis montes, sit sit. Tellus aliquam enim urna, etiam. Mauris posuere vulputate arcu amet, vitae nisi, tellus tincidunt. At feugiat sapien varius id.

Modules Used

No items found.

ROI and Statistics

Mi tincidunt elit, id quisque ligula ac diam, amet. Vel etiam suspendisse morbi eleifend faucibus eget vestibulum felis. Dictum quis montes, sit sit.

Productivity
$1.84 T
lost due to poor data management in the construction industry- FMI Corp
Productivity
$1.84 T
lost due to poor data management in the construction industry- FMI Corp

Who is that for?

Mi tincidunt elit, id quisque ligula ac diam, amet. Vel etiam suspendisse morbi eleifend faucibus eget vestibulum felis. Dictum quis montes, sit sit.

View More
https://cube.ms/case-studies/digitizing-workflows-for-a-g-43-mixed-use-development
Download Case Study
Oops! Something went wrong while submitting the form.